...
Project Type
Hospitality
Location
Palm Springs, California
Project Size
2,400 square feet
Date of Completion
----
Architect/Client
Parker Palm Springs II, LLC

The Parker Palm Springs Hotel

Lam+Tea Engineering provides competitive pricing with a great balance of cost and quality compared to other MEP firms. The Lam + Tea Engineers are down-to-earth, approachable, and easy to work with, which really stands out compared to other firms.

Alex Yamada

Senior Project Manager, Retail Development and Construction,
Probity International Corporation

Project Overview

The project will consist of renovations and expansion to an existing hotel located at 4200 East Palm Canyon Drive in Palms Springs, California.  The project will include designs for power, lighting HVAC, and plumbing for the new pool, kitchen and exterior parking lot.  

Design scope does not  include upgrading the electrical service to the building.  The scope of work described herein is based on file(s) received on 9/30/24.

We hope you are well. We are working on a small back of house kitchen addition to another hotel in Palm Springs, and wanted to see if we could get a proposal from Lam-Tea to assist us with this. The hotel is The Parker Palm Springs, located at 4200 E Palm Canyon Dr.

The project will consist of pool and hardscape improvements (by others) with a new ~1,500 sq. ft. standalone prep kitchen facility, as well as two small restroom buildings, 100 sq. ft. each. Please find attached site plan showing the area of the project relative to the existing hotel.

Similar to our work on the La Maison hotel, we will need to prepare a consolidated plan check set, inclusive of MEP scope. We are looking to
submit this at the end of 2024, depending on planning entitlements. More immediately, we will need assistance from an electrical engineer in preparing a photometric lighting diagram for landscape lighting (designed by others) for our Planning Department submission. The preparation of the photometric plan would take place over the next month. The MEP engineer will need to coordinate with architectural, structural, landscape design, kitchen consultant, and the civil engineer.

Project Scope

This renovation project for an existing hotel involved outdoor electrical service for hardscape improvements, a new standalone outdoor kitchen and two restroom facility buildings.  A photometric lighting design for landscape lighting, design for a new pool.

Services

Mechanical, Electrical and Plumbing Design

Highlights

MEP Engineering Highlights

Why Architects Choose Us

  • Hospitality Engineering Experience – MEP systems coordinated around guest amenities and existing hotel properties.
  • Outdoor Amenity Coordination – Engineering supports the pool area, standalone kitchen, restroom buildings, and exterior improvements.
  • Site-Wide MEP Integration – New infrastructure coordinated across multiple outdoor areas rather than a single interior space.
  • Landscape Lighting Photometrics – Exterior lighting design supported by photometric analysis.
  • Hardscape Coordination – Electrical infrastructure integrated with outdoor architectural and landscape improvements.
  • Standalone Facility Design – MEP infrastructure supports the new outdoor kitchen and two restroom buildings.
  • Pool-Area Coordination – Applicable MEP systems coordinated with the new pool while avoiding unsupported claims regarding specialty pool systems.
  • Existing Infrastructure Integration – New systems developed around an established hospitality property.
  • Defined Electrical Scope – Improvements coordinated without overstating the project as a main hotel electrical service upgrade.
  • Constructability Focus – Utility routing considered alongside landscape, hardscape, structures, and existing site conditions.

We provide MEP engineering for hospitality architects working on hotel renovations, resort amenities, outdoor guest spaces, pool-area improvements, restaurant and kitchen facilities, restroom buildings, and occupied hospitality properties.

Hospitality Project Experience

Our MEP engineering experience includes:

  • Hotel renovations
  • Resort improvements
  • Outdoor guest amenities
  • Pool-area improvements
  • Outdoor kitchens
  • Restroom facilities
  • Exterior electrical infrastructure
  • Landscape lighting
  • Photometric lighting design
  • Hardscape improvements
  • Parking lot improvements
  • Site utility coordination
  • Existing-property integration

Related Projects

Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.