...
Project Type
Residential, Multi-Family
Location
Los Angeles, California
Project Size
604,600 sq ft.
Date of Completion
----
Architect/Client
Jamison Properties, Inc.

1055 7th Street

Lam+Tea Engineering provides competitive pricing with a great balance of cost and quality compared to other MEP firms. The Lam + Tea Engineers are down-to-earth, approachable, and easy to work with, which really stands out compared to other firms.

Alex Yamada

Senior Project Manager, Retail Development and Construction,
Probity International Corporation

Project Overview

This project involves the adaptive reuse of an existing office building into a 33-story, 686-unit apartment tower totaling 604,584 sq ft. The redevelopment includes 14,890 sq ft of amenity spaces, featuring a club lounge, fitness center, and recreation areas such as games and theater rooms. The design transforms the building into a modern, vibrant residential community while maximizing functional space and enhancing resident experience.

Project Scope

Electrical Engineering
Lam+Tea provided comprehensive electrical design for the adaptive reuse project, including new electrical service, building lighting, general and emergency power, and empty conduit systems for telephone, security, and cable TV. All outlet locations and utility requirements were coordinated from architect-provided drawings and incorporated into the contract documents, ensuring a reliable and fully integrated electrical system to support the building’s residential and amenity functions.

Plumbing & Fire Protection
The plumbing and fire protection design encompassed building sanitary and storm drainage, hot and cold water systems, natural gas systems, and performance-based fire protection specifications. While sprinkler branch layouts, head locations, and hydraulic calculations were completed by the fire protection contractor, Lam+Tea’s design ensured proper coordination with the overall building systems, providing safe, efficient, and code-compliant infrastructure throughout the project.

Services

Electrical and Plumbing Design

Highlights

MEP Engineering Highlights

Why Architects Choose Us

  • High-Rise Adaptive Reuse Experience – MEP strategies developed around the physical constraints of existing commercial towers.
  • 686 Residential Units – Engineering coordinated across a substantial high-density multifamily program.
  • 33-Story Residential Conversion – Building systems adapted from commercial office infrastructure to residential use.
  • 604,600 SF Development – MEP design supports one of the most complex scales of multifamily adaptive reuse.
  • 14,890 SF of Amenities – Systems coordinated for club lounges, fitness facilities, gaming areas, and theater spaces.
  • Vertical MEP Planning – Mechanical, electrical, and plumbing distribution organized through an existing high-rise.
  • Residential Riser Coordination – Plumbing and other vertical infrastructure coordinated with repeated apartment layouts.
  • Existing Building Integration – New residential systems developed around retained building infrastructure.
  • Architectural & Structural Coordination – MEP routing coordinated with new unit planning and existing structural constraints.
  • Energy-Conscious Design – Engineering supports improved performance for the building’s new residential use.
  • Operational Performance – Systems planned with long-term residential building operations in mind.
  • Constructability Focus – Engineering coordination helps identify high-rise routing and infrastructure conflicts before construction.

We provide MEP engineering for multifamily architects working on office-to-residential conversions, high-rise adaptive reuse, large-scale apartment developments, mixed-use properties, and complex urban housing projects.

Multifamily & Adaptive Reuse Project Experience

Our engineering experience includes:

  • Office-to-residential conversions
  • High-rise adaptive reuse
  • Multifamily apartment towers
  • High-density urban housing
  • Existing commercial building conversions
  • Residential HVAC design
  • High-rise electrical distribution
  • Residential plumbing systems
  • Vertical MEP distribution
  • Riser and shaft coordination
  • Resident amenity spaces
  • Fitness facilities
  • Club lounges
  • Gaming and recreation areas
  • Existing-building integration

Related Projects

Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.