...
MEP engineering for supportive housing architects – 6531 Sepulveda adaptive reuse of an 80,000-square-foot hotel into 120 residential units in Los Angeles.
Project Type
Major Renovation, Community (Impact) Supportive Housing
Location
Los Angeles, California
Project Size
80,000 square feet
Date of Completion
----
Architect/Client
office42 Architecture

6531 Sepulveda Housing PHK

Lam+Tea Engineering provides competitive pricing with a great balance of cost and quality compared to other MEP firms. The Lam + Tea Engineers are down-to-earth, approachable, and easy to work with, which really stands out compared to other firms.

Alex Yamada

Senior Project Manager, Retail Development and Construction,
Probity International Corporation

Project Overview

The adaptive reuse of an existing four-story hotel, converting guest rooms into permanent residential living units. The renovation reconfigured the building from 133 hotel rooms to 120 residential units, including primarily studio units along with select one-bedroom and two-bedroom units and two new two-bedroom manager’s units.

Project Scope

MEP engineering services supported both interior renovations and exterior site improvements associated with the housing conversion. 

The project required MEP engineering for architects to support the conversion of hospitality spaces into long-term housing while maintaining efficient use of existing building infrastructure. The design approach focused on targeted system upgrades and coordination with the architectural renovation strategy to minimize disruption to existing building systems while delivering code-compliant residential environments.

Services

Mechanical, Electrical and Plumbing Design

Highlights

MEP Engineering Highlights

Why Architects Choose Us

Architects rely on our adaptive reuse experience to develop practical MEP strategies that balance existing-building conditions with the requirements of permanent residential occupancy.

  • Hotel-to-Housing Adaptive Reuse – MEP systems coordinated for the conversion of 133 hotel rooms into 120 permanent residential units.
  • Strategic Infrastructure Reuse – Existing PTAC systems retained while air distribution was modified for renovated residential layouts.
  • Detailed Electrical Engineering – Scope included single-line diagrams, voltage drop and short circuit analysis, egress lighting calculations, and panel modifications.
  • Title 24 Compliance – Electrical and mechanical energy compliance documentation integrated into the design.
  • Site & Utility Coordination – Building infrastructure coordinated with civil and landscape improvements, laundry facilities, and motorized parking gates.

We work as a collaborative MEP engineering consultant, helping architects deliver practical, constructable, and code-compliant adaptive reuse and supportive housing projects.

Supportive Housing & Adaptive Reuse Experience

Our team provides MEP engineering for supportive housing architects on:

  • Hotel-to-housing conversions
  • Permanent supportive housing
  • Community and impact housing
  • Adaptive reuse residential projects
  • Existing multifamily building renovations

Related Projects

Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.