Lam+Tea Engineering provides competitive pricing with a great balance of cost and quality compared to other MEP firms. The Lam + Tea Engineers are down-to-earth, approachable, and easy to work with, which really stands out compared to other firms.
Lam+Tea Engineering provides competitive pricing with a great balance of cost and quality compared to other MEP firms. The Lam + Tea Engineers are down-to-earth, approachable, and easy to work with, which really stands out compared to other firms.
This project involves the construction of a new 17,600 sq. ft., single-story prefabricated Butler building on the NBC Universal lot, replacing the existing B7234 storage barn. The new facility will feature full heating and cooling systems, a modern dust collection system, and code-compliant restrooms, providing a functional, efficient, and safe environment. Designed with both operational performance and long-term durability in mind, the building will seamlessly integrate into the existing campus while meeting all current building standards and occupant needs.
Mechanical Engineering:
Mechanical engineering services for this project focus on delivering a fully integrated and efficient HVAC system for the new 17,600 sq. ft. Butler building. The scope includes air conditioning and heating systems, a dedicated dust collection system, and a toilet exhaust system, ensuring optimal indoor air quality, comfort, and code compliance throughout the facility.
Electrical Engineering:
Electrical engineering services encompass a complete design of the building’s electrical infrastructure. This includes a new service fed from the existing site distribution, interior and exterior lighting, power distribution to all equipment and receptacles, and empty conduit systems for telephone and security. Outlet locations and utility requirements provided by others are incorporated into the contract documents, ensuring a coordinated, safe, and reliable electrical system.
Plumbing Engineering:
Plumbing engineering services provide a comprehensive design for all building water, gas, and drainage systems. The scope includes building storm drainage, hot and cold water systems, sanitary drainage, AC condensate drains, and a natural gas system. These designs ensure efficient, code-compliant operation while supporting the functional needs of the new Butler building.
Lam + Tea Engineering understands the technical challenges associated with designing industrial facilities and integrating new buildings into established campuses.
Our engineering approach emphasizes:
Coordinating MEP systems with prefabricated industrial building designs.
Developing complete HVAC systems for industrial environments.
Integrating dedicated dust collection and ventilation infrastructure.
Designing electrical distribution for equipment and building operations.
Connecting new facilities to existing site electrical infrastructure.
Coordinating domestic water, sanitary drainage, storm drainage, and natural gas systems.
Integrating mechanical and electrical equipment requirements.
Addressing constructability, operational functionality, and applicable building codes.
We provide MEP engineering for industrial architects working on industrial buildings, manufacturing support facilities, prefabricated structures, campus developments, and specialized operational environments.
Our relevant engineering experience includes:
New industrial building construction
Prefabricated industrial facilities
Butler building MEP design
Industrial HVAC engineering
Heating and air-conditioning systems
Industrial dust collection coordination
Industrial exhaust ventilation
Equipment electrical distribution
New electrical service connections
Interior and exterior industrial lighting
Low-voltage conduit infrastructure
Domestic water distribution
Industrial sanitary drainage
Building storm drainage
AC condensate drainage
Natural gas plumbing
Existing campus utility integration
Constructability-focused engineering
Architect–engineer collaboration