Lam+Tea Engineering provides competitive pricing with a great balance of cost and quality compared to other MEP firms. The Lam + Tea Engineers are down-to-earth, approachable, and easy to work with, which really stands out compared to other firms.
Lam+Tea Engineering provides competitive pricing with a great balance of cost and quality compared to other MEP firms. The Lam + Tea Engineers are down-to-earth, approachable, and easy to work with, which really stands out compared to other firms.
The project involves the interior renovation of an existing medical MRI suite located at 1441 Eastlake Avenue in Los Angeles, California. The renovation includes upgrades to the reception area, restroom, MRI room, control room, equipment room, exterior equipment yard, and supporting spaces, totaling approximately 1,800 square feet. This project is located within an OSHPD 1 hospital facility and will be designed in accordance with applicable healthcare regulatory requirements. The scope of work is based on information received on January 15, 2025.
Our electrical scope includes a full assessment of existing conditions and the design of a complete interior power and lighting system for the MRI suite renovation. Services include reviewing available as-built documents, evaluating existing system capacity and load requirements, and identifying points of connection for new equipment. The work covers interior lighting circuiting, lighting controls, emergency egress lighting with required photometric calculations, and energy code compliance documentation. Power distribution plans will be developed to support all mechanical, plumbing, and medical equipment needs, including MRI equipment located both inside the suite and within the exterior equipment yard. Low-voltage conduit pathways will be incorporated for system coordination, and a single-line diagram with supporting voltage drop and AIC calculations will be provided where applicable.
The mechanical scope consists of evaluating existing HVAC conditions and designing appropriate system modifications to support the MRI suite upgrade. Work includes developing zoning layouts, specifying new mechanical equipment—including an exterior condensing unit—and revising existing supply and return ductwork to suit the renovated layout. New air distribution and diffuser layouts will be designed to support comfort, code compliance, and specialized healthcare requirements. Mechanical energy compliance documentation will be provided, along with ventilation and cooling system design tailored specifically for MRI equipment needs.
Our plumbing services include assessing the existing plumbing infrastructure and designing system revisions to support the renovated MRI suite. This includes new plumbing fixtures for the control area and restroom, integration of required HVAC condensate drainage, and any necessary modifications to waste, water, and vent systems. A plumbing riser diagram will also be provided to support coordination and permit requirements.
Lam + Tea Engineering understands the coordination required for specialized healthcare renovations involving advanced medical equipment.
Our engineering approach emphasizes:
Integrating MEP systems with specialized medical imaging requirements.
Coordinating engineering infrastructure within existing hospitals.
Addressing applicable OSHPD and healthcare facility requirements.
Supporting medical equipment electrical loads and environmental control needs.
Coordinating interior and exterior equipment infrastructure.
Considering shielding-related building-system constraints.
Developing practical, constructability-focused engineering solutions.
Collaborating with architects and medical equipment teams.
We provide MEP engineering for healthcare architects working on MRI suites, diagnostic imaging facilities, hospital renovations, outpatient clinics, medical offices, and other healthcare environments requiring specialized building-system coordination.
Our relevant engineering experience includes:
MRI suite renovations
Diagnostic imaging facilities
Hospital tenant improvements
OSHPD-regulated healthcare projects
Medical equipment infrastructure
Healthcare HVAC design
Medical imaging environmental control
MRI electrical power coordination
Healthcare plumbing engineering
Exterior medical equipment integration
Shielding-related MEP coordination
Existing hospital renovations
Healthcare regulatory coordination
Medical equipment load evaluation
Hospital operational continuity considerations
Architect–engineer collaboration
Constructability-focused healthcare design