...
Project Type
High-End Retail / Tenant Improvements
Location
Torrance, California
Project Size
11,000 sq ft.
Date of Completion
----
Architect/Client
Abramson Architects

Cedars Lomita 3440 Common Areas

Lam+Tea Engineering provides competitive pricing with a great balance of cost and quality compared to other MEP firms. The Lam + Tea Engineers are down-to-earth, approachable, and easy to work with, which really stands out compared to other firms.

Alex Yamada

Senior Project Manager, Retail Development and Construction,
Probity International Corporation

Project Overview

The project involves the interior lighting renovation of common areas within a low-rise medical office building located at 3440 Lomita Boulevard in Torrance, California. Based on design information received on January 28, 2025, the scope includes updated lighting improvements for corridors, restrooms, and elevator lobbies to enhance functionality, energy efficiency, and overall visual comfort throughout the shared spaces.

Project Scope

Electrical Engineering
Scope of services includes a review of available as-built drawings and site observations to assess existing electrical conditions and point of connection. The team evaluates system capacity and projected loads to determine if additional electrical equipment is required. Services include the design of the interior electrical system, preparation of lighting circuiting plans (lighting layout and fixture specifications by Architect), Title 24–compliant lighting control diagrams, state lighting energy compliance documentation, and emergency egress lighting layouts with required photometric calculations. A single-line diagram will be provided based on field observations and/or available as-built information.

Services

Electrical Design

Highlights

Why Architects Choose Us

  • Healthcare Facility Experience – Electrical engineering tailored to the shared spaces of an existing medical office building.

  • Common-Area Renovation Expertise – Lighting improvements coordinated across corridors, restrooms, and elevator lobbies.

  • Existing Electrical Assessment – Available as-builts and site conditions reviewed before design.

  • Capacity Evaluation – Existing electrical infrastructure evaluated against anticipated lighting loads.

  • Architectural Lighting Integration – Architect-designed fixture layouts supported by coordinated electrical circuiting.

  • Title 24 Expertise – Lighting controls and state energy compliance documentation incorporated into the design.

  • Emergency Lighting Design – Egress lighting layouts and required photometric calculations prepared.

  • Electrical Distribution Documentation – Single-line diagrams developed using available building information.

  • Energy-Efficient Renovation – Lighting improvements designed with applicable California energy requirements in mind.

  • Existing Building Integration – New electrical components coordinated with established infrastructure.

  • Constructability Focus – Existing connection points and site conditions considered during design.

  • Architect–Engineer Collaboration – Technical electrical requirements coordinated with architectural lighting intent.

We provide electrical engineering for healthcare architects working on medical office buildings, healthcare-related commercial properties, common-area renovations, lighting modernization, and existing facilities requiring code-compliant electrical improvements.

Healthcare & Medical Office Project Experience

Our relevant engineering experience includes:

  • Medical office building renovations

  • Healthcare common-area improvements

  • Commercial lighting renovations

  • Corridor lighting

  • Elevator lobby lighting

  • Restroom lighting

  • Existing electrical capacity assessments

  • Lighting circuiting

  • Architectural lighting coordination

  • Title 24 lighting controls

  • State lighting energy compliance

  • Emergency egress lighting

  • Photometric calculations

  • Electrical single-line diagrams

  • Existing-building electrical integration

  • Electrical permit documentation

Related Projects

Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.